USNS John Lewis (T-AO 205)
After launching on 12 January 2021. The ship appears to be nearly complete. Photo by GD NASSCO.
Photo No. 210112-N-N2201-001
Source: www.msc.usff.navy.mil/Press-Room/Photo-Gallery
|
|
USNS Harvey Milk (T-AO 206)
During launching on 6 November 2021. Photo by GD NASSCO.
Photo No. 211106-N-WD133-493
Source: www.msc.usff.navy.mil/Press-Room/Photo-Gallery
|
|
USNS John Lewis (T-AO 205)
On initial builder's trials in early February 2022. Photo by GD NASSCO.
Photo No. 220201-N-CX372-0003
Source: www.msc.usff.navy.mil/Press-Room/Photo-Gallery
|
|
USNS John Lewis (T-AO 205)
On initial builder's trials in early February 2022. Photo by GD NASSCO.
Photo No. 220201-N-CX372-0001G
Source: www.navy.mil/Resources/Photo-Gallery
|
|
USNS John Lewis (T-AO 205)
On initial builder's trials, from which she returned to port on 4 February 2022. Photo by GD NASSCO.
Photo No. 220207-N-N2201-011, repeated as 220728-N-N2201-001.
Source: www.msc.usff.navy.mil/Press-Room/Photo-Gallery
|
|
USNS John Lewis (T-AO 205)
Pierside at Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD), on 4 November 2022. After delivery in July the ship was then in the beginning months of a year-long ship qualification trials schedule. This had been paused by NSWC PHD for a stores resupply and minor repairs by builder representatives. The ship's fuel and cargo UNREP delivery stations use the new Electric Standard Tensioned Replenishment Alongside Method (E-STREAM) technology, designed by NSWC PHD. USNS John Lewis is the first oiler to have the new E-STREAM systems on board, and these trials gave the command’s UNREP team members their first opportunity to see the system installed on a ship. Photo by USN.
Photo No. 221104-N-HH412-650
Source: www.msc.usff.navy.mil/Press-Room/Photo-Gallery
|
|
USNS Earl Warren (T-AO 207)
Being launched after christening on 22 Jan 2023. Photo by GD NASSCO.
Photo No. Unknown
Source: www.navaltoday.com from NASSCO social media post
|
|
USNS Harvey Milk (T-AO 206)
During trials circa spring 2023.
Photo No. Unknown (U.S. Navy photo)
Source: www.navalnews.com/naval-news/2023/07/
|
|
USNS Lucy Stone (T-AO 209)
The first block after being placed on the ways on 27 April 2023. The sister on the ways behind her appears to be almost complete, suggesting that this is actually a view of the first block of Robert F Kennedy (T-AO 208) in December 2022 with Earl Warren (T-AO 207) nearly ready for launching a month later behind it. Photo by GD NASSCO.
Photo No. Unknown
Source: www.navaltoday.com from NASSCO social media post
|
|